CityMA
Posted
Sep 30, 2026
Oct 14, 2026
HVAC Control System Replacement
HVAC Control System Replacement.
Find open HVAC Control Systems RFPs from state agencies, local governments, school districts and higher ed institutions.
20 opportunities shown.
CityMA
Posted
Sep 30, 2026
Oct 14, 2026
HVAC Control System Replacement.
CityUT
Posted
-
Oct 20, 2026
Procurement of a qualified HVAC contractor for the replacement and installation of new Carrier heating, ventilation, and air conditioning equipment at the South Jordan Animal Control Building.
CityUT
Posted
-
Oct 20, 2026
Procurement of a qualified HVAC contractor for the replacement and installation of new Carrier heating, ventilation, and air conditioning equipment at the South Jordan Animal Control Building.
Pennsylvania Department of General Services
State AgencyPA
Posted
Oct 1, 2026
Sep 9, 2031
The purpose of this temporary rented electrical equipment and temporary rented temperature control equipment itq is to qualify responsible and responsive contractors to provide temporary rented electrical equipment and temporary rented temperature control equipment to the commonwealth.
CityPA
Posted
Sep 21, 2026
Nov 3, 2026
Renew and upgrade the HVAC controls serving the Police Department portions of the Borough offices.
CityTX
Posted
-
Nov 12, 2026
Project involves the replacement and upgrade of hvac systems.
Missouri Office of Administration
State AgencyMO
Posted
-
Nov 5, 2026
Provide HVAC and associated control upgrades to the existing two-story headquarters building.
Special DistrictMI
Posted
Oct 10, 2026
Nov 6, 2026
Scope Summary: Furnishing and installing duct-mounted exhaust temperature sensors, hydronic reheat control valve and space sensor for hallway heating, associated BAS controller expansion modules, conduit, low-voltage wiring, programming, commissioning, and as-built documentation.
CountyFL
Posted
-
Nov 12, 2026
Palm Beach County is requesting sealed bids from qualified contractors under its annual HVAC services contract for the Supervisory of Elections HVAC Replacement Project.
Wisconsin Department of Administration
State AgencyWI
Posted
Sep 14, 2026
Oct 27, 2026
Work includes : replace two (2) existing gas fired make-up air units on the roof that serve the barracks spaces with new rooftop units.
Missouri Office of Administration
State AgencyMO
Posted
Sep 21, 2026
Nov 5, 2026
Porite Roof, Electrical & HVAC Repairs project consists of interior and exterior repair work for replacements and upgrades of the existing HVAC systems and control systems.
Missouri Office of Administration
State AgencyMO
Posted
Sep 21, 2026
Nov 5, 2026
Porite Roof, Electrical & HVAC Repairs project consists of interior and exterior repair work for replacements and upgrades of the existing HVAC systems and control systems.
CountyNY
Posted
Sep 25, 2026
Oct 13, 2026
Units shall be factory assembled and tested including leak testing of the DX coils, pressure testing of the refrigeration circuit, and run testing of the completed unit.
Sumter Landing Community Development District
Special DistrictFL
Posted
Sep 25, 2026
Oct 28, 2026
Work includes removal and replacement of four (4) direct-expansion split systems with high-efficiency split system units with dehumidification capabilities via variable speed fans and multi-stage compressors.
CountyFL
Posted
-
Nov 12, 2026
Palm Beach County is requesting sealed bids from qualified contractors under its annual HVAC services contract for the Supervisory of Elections HVAC Replacement Project.
Wake County Public School System
School DistrictNC
Posted
-
Oct 22, 2026
Procurement of professional turnkey design services for HVAC, lighting, intercom, fire alarm, chiller/pump, boiler, and control system replacement at LC Carpenter Elementary School.
U.S. Army Engineer District Portland
FederalOR
Posted
Apr 1, 2026
Nov 10, 2026
The U.S. Army Corps of Engineers, Portland District posted a presolicitation for comprehensive HVAC upgrades to the John Day Dam Powerhouse, including replacement of chillers, new pumps, piping, air handlers, and digital control systems.
CountyVA
Posted
Aug 21, 2026
Oct 14, 2026
Work includes removal and disposal of ACU-8 and associated ACC-2, ACU-9 and associated ACC-3, ACU-10 and associated ACC-5, ACU-11 and associated acc-6, ACU-7 and associated ACC-4, ACU-6 and associated ACC-1 and all associated refrigeration piping, piping accessories and supports serving the main water plant.
Posted
Oct 7, 2026
Oct 28, 2026
Upgrades, preventative and corrective maintenance and for parts and services for the TRANE® Tracer Summit Automation System (Tracer) and TRANE® Tracer System Controller (SC) systems.
CountyWA
Posted
Oct 2, 2026
Oct 20, 2026
Construct mezzanine partition wall; misting system modifications and controls; mezzanine supply fan installation; demolition of dust hood and duct capping; air barrier repairs; hvac testing and balancing; general conditions; contractor engineering; apprenticeship utilization incentive.
Recent board meeting, budget, plan, and contract evidence, connected to the buyer and relevant decision-makers.
- The city council's budget committee is weighing three approaches to the police north building's mold crisis, with costs from roughly $17.5 million to $36 million. - The mold is traced to a malfunctioning makeup air unit and its controls, managed by an outside vendor, which the police chief says failed to maintain proper humidity levels. - The building has been vacant since late November or early December 2025, underscoring the urgency of the HVAC-related remediation. - The renovation scope would address HVAC issues comprehensively, including replacing plumbing, electrical lines, and air vents down to the light switch plate.
- The facilities team detailed persistent failures of 35-year-old HVAC equipment, including a 1990 chiller whose parts are no longer manufactured. - Humidity control failures in the 500 hallway classrooms have caused wet floors and hot rooms, disrupting learning conditions. - A chiller breakdown forced an e-learning day, underscoring the operational impact of the aging systems. - The district plans to present systematic solutions for its facilities issues at the next board meeting.