CityCA
Posted
Sep 24, 2026
Oct 21, 2026
Description: The City of Los Angeles, Engineering Bureau, is soliciting bids from five named prequalified prime contractors for construction work addressing a hazardous slope at 2735 Whittier Boulevard in Boyle Heights. The work includes a roughly 10.5-foot-high, 16-linear-foot cantilevered bulkhead with three cast-in-drilled-hole piles, reinforced-concrete retaining walls, a grade beam, and reconstruction of part of the sidewalk. The project is intended to mitigate a public-safety threat from encroaching debris and protect the public right-of-way.
City · CA, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of Los Angeles.
Adjacent opportunities open for bidding right now.
CityCA
Posted
Sep 24, 2026
Oct 21, 2026
The City of Los Angeles, Engineering Bureau, is soliciting bids from five named prequalified prime contractors for construction work addressing a hazardous slope at 2735 Whittier Boulevard in Boyle Heights. The work includes a roughly 10.5-foot-high, 16-linear-foot cantilevered bulkhead with three cast-in-drilled-hole piles, reinforced-concrete retaining walls, a grade beam, and reconstruction of part of the sidewalk. The project is intended to mitigate a public-safety threat from encroaching debris and protect the public right-of-way.
CityNJ
Posted
Oct 10, 2026
Oct 23, 2026
Bulkhead at the south park community pool and complex.
Special DistrictFL
Posted
Aug 28, 2026
Oct 22, 2026
Construction of approx. 1,200 LF of combination pipe and z-sheet pile anchored bulkhead.
Posted
Aug 24, 2026
Oct 16, 2026
The United States Coast Guard’s Aviation Logistics Center intends to solicit and negotiate a sole-source BOA call with Sikorsky Aircraft Corporation for the items listed in Attachment 1. This special notice is not a request for competitive proposals, but responsible sources may submit a quotation for the agency’s consideration. The response deadline is October 16, 2026, at 2:00 p.m. EDT, and requested delivery is within 200 days after receipt of order.