CityCA
Posted
Oct 2, 2026
Oct 29, 2026
Effluent 66" Valve Replacement
Work consists of the removal and replacement of a 66" butterfly valve.
Description: In general, the work consists of: thermal valve replacement & catwalk at the heat and power plant.
StateAgency · WI, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalThese related opportunities are still open for bidding.
CityCA
Posted
Oct 2, 2026
Oct 29, 2026
Work consists of the removal and replacement of a 66" butterfly valve.
Special DistrictMA
Posted
-
Nov 4, 2026
The Norton Housing Authority is rebidding construction work at Woodland Meadows (667-1 & 667-2) in Norton, Massachusetts, to replace tub surrounds and shower-valve assemblies. The scope includes removing existing tiled surrounds, substrates, and shower fixtures, then installing insulation, a vapor barrier, cement board, one-piece wall-surround systems, and mixing valves while leaving the existing bathtubs in place. General bids are due November 4, 2026, and filed plumbing sub-bids are due October 21, 2026.
Metropolitan Water Dist Of Southern California
Special DistrictCA
Posted
Aug 11, 2026
Oct 20, 2026
The work consists of removing an existing discharge valve and actuator; installing a metropolitan-furnished 54" fixed cone valve and actuator; recoating the discharge pipeline interior; refurbishing valve house and a 54" slide gate valve; upgrading associated electrical systems; replacing electrical and telecommunications cables; fabricating and installing a temporary underwater isolation device; improving the access road, and other appurtenant work.
Madison Metropolitan Sewer District
Special DistrictWI
Posted
Oct 13, 2026
Nov 3, 2026
The Engine 3-Way Valve Replacement project involves replacing four thermostatically controlled 3-way valves with rotary electric valves. The District operates two Waukesha engines and each engine has two 3-way valves that regulate the flow of jacket water to a radiator and heat exchanger. This project also includes necessary piping modifications and power and control wiring.
Decision makers connected to this RFP from Wisconsin Department of Administration.