CountyLA
Posted
Oct 9, 2026
Nov 5, 2026
2026 CWEF Water System Improvements Project RFP
Work includes new water mains, valves, fittings, flush valves, connections, and associated appurtenances.
Description: Work includes approx 8 LF of 8" PVC C900 water line; 5,975 LF of 12" PVC C900 water line; 395 LF of 3/4" pure-core water line service; 223 LF of 8" PVC C900 water line; 24 LF of 2" pan concrete curb & gutter; 23 SY of 6" concrete flatwork; 1,598 SY of 5" asphalt paving; 340 LF of 8" PVC C900 water line; 245 LF of 3/4" pure-core water line service; 308 LF of 4" blueboard insulation; 2,065 LF of 12" PVC C900 water line; 20 LF of 3/4" pure-core water line service; 320 LF of 2" HDD water line; 10 LF of 4" water line direct bury.
City · CO, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of Rifle.
These related opportunities are still open for bidding.
CountyLA
Posted
Oct 9, 2026
Nov 5, 2026
Work includes new water mains, valves, fittings, flush valves, connections, and associated appurtenances.
CityIL
Posted
Sep 8, 2026
Oct 23, 2026
The work generally consists of furnishing and installation of water system piping, fittings, valves, hydrants, services, connections, disconnections, and appurtenances for potable water. Installation will consist approx. of 1,500 LF of 4" PVC SDR 21 water main along the design route as shown on the plans. This work also includes surface restoration with various pavements, curbing, and sidewalks. This work shall include all labor, supervision, materials, supplies, transportation, equipment, and services necessary and required to perform the project as set forth in the Contract Documents. WTP Controls and SCADA Replacement The work generally consists of furnishing and installation of controls and communication system within the existing Water Treatment Plant. The city would like to update the entire control panel. Upgrades would also include upgrading to cellular communication for easier monitoring, maintenance, troubleshooting, and to have remote support. The new system would also include a new programmable Logic Controller (PLC) and pressure monitoring controls. An HMI screen, a new Supervisory Control and Data Acquisition (SCADA), and replacing the VFDS at the existing pumps are also all parts of the new control upgrades.
CityIN
Posted
Sep 9, 2026
Nov 5, 2026
Work includes approx 1 LS meter system network infrastructure; 14 SY HMA pavement restoration; 1 LS erosion control.
CountyGA
Posted
Sep 14, 2026
Oct 22, 2026
Work includes approx 80 LF of 16" steel casing, jack & bore; 550 LF of 10" DIP-water, zinc coated; 820 LF of 12" DIP-water, zinc coated; fire hydrants, valves, and associated infrastructure work.