Posted
Oct 13, 2026
Nov 4, 2026
Creasy Creek Bridge Upgrade RFP
Work includes but is not limited to: removal of existing timber deck and curbs; removal of two existing steel girders and transport off-site; off-site removal of all loose rust, deteriorated coatings, and corrosion from existing steel bridge girders and related components; surface preparation and application of a three-coat protective paint system in accordance with the project specifications for the two existing steel girders; installation of painted existing steel girders and related components; installation of steel floor beams; installation of galvanized steel grating deck; installation of bridge rail/barrier system; roadway repair at bridge deck terminations; removal and replacement of existing roadway signage.