Gardnerville Ranchos General Improvement District
Special DistrictNV
Posted
Sep 28, 2026
Oct 20, 2026
High Side Tank Improvement Project RFP
The work consists of rehabilitation and upgrade of the existing 3,000,000 gallon High Side Tank consisting of but not limited to: interior blasting and epoxy coating with mill scale removal as needed; tank disinfection; replacement of cathodic protection anode bags, upsizing of existing manway, replacement of vent mesh screening, and tank level indicator; installation of a fire hydrant, temporary pressure relief valve, and associated piping; and modification of pressure set-points at the Long Valley Booster Pump Station pressure regulating station.
