CityOK
Posted
Sep 21, 2026
Oct 20, 2026
Description: The Municipality of North Grenville seeks proposals from qualified consulting firms to prepare a closure report for the Burritts Rapids Waste Disposal Site. The report is to be submitted to Ontario’s Ministry of the Environment, Conservation and Parks. Firms must contact Public Works to obtain the tender package.
City · ON, CA
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from North Grenville.
Adjacent opportunities open for bidding right now.
CityOK
Posted
Sep 21, 2026
Oct 20, 2026
The Work generally consists of excavation and grading of the existing landfill surface; construction of a compacted low-permeability barrier layer and vegetated erosion layer (final cap); construction of concrete letdown channels, silt fencing, and other erosion/sediment control measures; leachate collection system repair; and establishment of permanent vegetative cover.
CityBC
Posted
Oct 1, 2026
Oct 29, 2026
The City of Mission is seeking proposals from qualified landfill engineering consultants to update the Mission Landfill Design, Operations and Closure Plan (DOCP). The work also includes establishing a standing arrangement for landfill engineering services. Proposals are due October 29, 2026, at 3:00 PM PDT.
CityON
Posted
Sep 23, 2026
Oct 29, 2026
The Municipality of North Grenville is seeking a consulting firm to prepare a Municipal Class Environmental Assessment (MCEA), Schedule 'C'. The assignment would upgrade three manhole-to-manhole sections of the sanitary main on Curry Street and replace and twin the Jack Street-to-Curry Street syphon in Catchment Area #4. The solicitation is a consulting-services procurement, not a grant program, and remains open for responses until October 29, 2026 at 2:00 PM EDT.
Posted
-
Oct 20, 2026
Repair of approx.y 800 LF of an existing drainage swale and 400 LF of stormwater drainage piping and two headwalls which run over the surface of the Princeton Sanitary Landfill and in proximity to a solar array. The swale repair includes the installation of channel lining, rip rap channel lining, gabion baskets, and scours holes for erosion control. The project also includes the installation of additional soil cover material along portions of the landfill side slope areas and the construction of a soil berm on the western landfill limits. Work also includes the final stabilization and restoration of all areas disturbed during construction activities and all other work incidental thereto.