Higher EducationIL
Posted
Oct 14, 2026
Nov 11, 2026
Flooring Building A 3rd Floor RFP
Project consists of flooring.
Description: West Virginia University seeks a qualified proposer to furnish materials, installation, tools, equipment, and labor for renovations and upgrades to the third-floor STEPS Lab at the Health Sciences Center in Morgantown, West Virginia. The work includes substantial and final completion deadlines, with liquidated damages for delays, and a non-mandatory pre-proposal meeting and site visit is available. Proposals must be submitted in PDF format through the solicitation website.
HigherEducation · WV, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalThese related opportunities are still open for bidding.
Higher EducationIL
Posted
Oct 14, 2026
Nov 11, 2026
Project consists of flooring.
CityFL
Posted
Oct 4, 2026
Nov 5, 2026
Project consists of city hall 3rd floor renovations. Services include the City Clerk's storage room being converted to a break room and a conference room. Improvements include, but are not limited to, new flooring, painting, electrical, cabinets, and carpentry. The City Attorney/City Clerk's area will have a new wall installed and a door removed. Improvements include, but are not limited to, painting, electrical, and carpentry.
Tennessee Department of General Services
State AgencyTN
Posted
Oct 14, 2026
Nov 30, 2026
This RFP is for a three (3) year contract for an Acoustic and/or Vibration Monitoring System with installation, and five (5) years of monitoring system maintenance and reporting.
CityCA
Posted
-
Oct 20, 2026
Step, working level for octagon fiberglass poles, 3/4" bolt x 25", material astm a36 or a307 steel, hot dip galvanized per astm a53, shall be unc threaded on one end with 90-degree hook on the step ene, threaded portion shall extend 6 inches outward from the nut. Allowable length variation shall be +/- 0.250", shall be equipped with one 3" square flat washer welded on the step end, with a 5/16-inch anti-rolling hole, the other end shall be equipped with one 3-inch square flat washer, one star washer, and one square nut, the pole step shall be able to withstand 750 pound static load without any elastic deformatio, 1,400 each.
Decision makers connected to this RFP from West Virginia University.