Illinois Department of Transportation
State AgencyIL
Posted
-
Nov 6, 2026
113-76M46 - Culvert Replacement
Approx. 0.250 AC Tree removal, acres; 1,825 CY earth excavation; 135 P nitrogen fertilizer nutrient; 2,068 ft perimeter erosion barrier; 11,632 P bituminous materials (prime coat); 44 Ton incidental hot-mix asphalt surfacing; 2 EA precast reinforced concrete flared end sections 30"; 537.500 ft steel plate beam guardrail, type A, 6 ft posts; 454 ft short term pavement marking. See outside link.
