Virginia Beach City Public Schools
School DistrictVA
Posted
Oct 6, 2026
Nov 5, 2026
Description: Brandon Middle School HVAC Replacement: Refer to Bid Documents for scope of work. Drawings and Specifications may be seen at the following locations: A&E Reprographics, Norfolk; Construct Connect; Valley Construction News (Bid Online); Dodge Data & Analytics; Builders and Contractors Exchange, Norfolk. Sets of drawings and specifications may be obtained, as complete sets of Bidding Documents, as hard copy or PDF version on CD, upon purchase for each set, from Business Document Solutions, Inc, (757) 390-2755. An additional fee for shipping or delivery may be charged for those Contractors who wish to have their sets mailed or delivered. No partial sets will be distributed. In Person Conference Date: The school grounds will be open for inspection at a non-mandatory pre-bid conference on Monday, October 19th at 4:30 PM. Contractors must sign in and obtain a visitor pass at the main entrance security desk prior to any interior or exterior building or site review. If unable to attend the non-mandatory pre-bid conference, bidders may coordinate inspection of the school grounds at a different time/date through VBCPS Project Manager Fred Reynolds by e-mailing him at fred.reynolds@vbschools.com. Bidders are not permitted to access the schools outside of the non-mandatory pre-bid conference without prior coordination with Fred Reynolds. Bidder questions may be directed to Amber Genung, Woolpert, amber.genung@woolpert.com or call (703) 731-7336. All bidder questions must be received no later than Friday October 30th, 2026. Conference Date (virtual): Date: November 5, 2026 at 2:15 PM EST. Microsoft Teams meeting information and teleconference dialing information were provided in the solicitation package.
SchoolDistrict · VA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Virginia Beach City Public Schools.
Adjacent opportunities open for bidding right now.
Virginia Beach City Public Schools
School DistrictVA
Posted
Oct 6, 2026
Nov 5, 2026
Brandon Middle School HVAC Replacement: Refer to Bid Documents for scope of work. Drawings and Specifications may be seen at the following locations: A&E Reprographics, Norfolk; Construct Connect; Valley Construction News (Bid Online); Dodge Data & Analytics; Builders and Contractors Exchange, Norfolk. Sets of drawings and specifications may be obtained, as complete sets of Bidding Documents, as hard copy or PDF version on CD, upon purchase for each set, from Business Document Solutions, Inc, (757) 390-2755. An additional fee for shipping or delivery may be charged for those Contractors who wish to have their sets mailed or delivered. No partial sets will be distributed. In Person Conference Date: The school grounds will be open for inspection at a non-mandatory pre-bid conference on Monday, October 19th at 4:30 PM. Contractors must sign in and obtain a visitor pass at the main entrance security desk prior to any interior or exterior building or site review. If unable to attend the non-mandatory pre-bid conference, bidders may coordinate inspection of the school grounds at a different time/date through VBCPS Project Manager Fred Reynolds by e-mailing him at fred.reynolds@vbschools.com. Bidders are not permitted to access the schools outside of the non-mandatory pre-bid conference without prior coordination with Fred Reynolds. Bidder questions may be directed to Amber Genung, Woolpert, amber.genung@woolpert.com or call (703) 731-7336. All bidder questions must be received no later than Friday October 30th, 2026. Conference Date (virtual): Date: November 5, 2026 at 2:15 PM EST. Microsoft Teams meeting information and teleconference dialing information were provided in the solicitation package.
School DistrictVA
Posted
Sep 12, 2026
Oct 15, 2026
Project consists of rooftop unit replacement, diffuser and ductwork replacement in the corridors and classrooms, condensate line replacement, associated bas controls work, complete corridor ceiling replacement, and partial ceiling removal, re-work, and replacement.
School DistrictPA
Posted
Oct 12, 2026
Nov 19, 2026
Provide hvac upgrades.
CityCT
Posted
Oct 8, 2026
Nov 12, 2026
Work includes replacing two existing air handling units and associated external hot water heating coils, outdoor air-cooled condensing units, refrigerant piping, heating hot water piping, and electrical power.