Fort Pierce Utilities Authority
Special DistrictFL
Posted
-
Nov 9, 2026
Description: The Stanislaus Council of Governments is seeking proposals from qualified architectural firms for design services at 1407 I Street in Modesto. The project will create a public boardroom, convert the former bank teller area into a meeting chamber, and remodel surrounding office space. The selected firm will provide services from programming and schematic design through construction documents, bidding, and construction administration.
SpecialDistrict · CA, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Stanislaus Council Of Governments.
Adjacent opportunities open for bidding right now.
Fort Pierce Utilities Authority
Special DistrictFL
Posted
-
Nov 9, 2026
Fort Pierce Utilities Authority is seeking qualification statements from firms able to provide professional engineering, architectural, and design services on a continuing-contract basis. Services may support utility, infrastructure, and facility projects, including planning, studies, permitting, design, procurement support, and construction-phase work. Qualified firms may receive master agreements, with individual projects assigned later through specific authorizations; the solicitation does not guarantee an award.
Posted
Oct 7, 2026
Nov 9, 2026
Seeks professional services to support the department's capital program.
CityGA
Posted
-
Oct 23, 2026
The City of Cartersville seeks a qualified architectural and engineering firm to provide full-service design for redevelopment of the Cartersville Sports Complex and improvements at Hicks Park. The work includes design for baseball fields, concession facilities, a press box, locker rooms, a retaining wall, and related site improvements, with coordination with a separately procured construction manager-at-risk. The anticipated construction budget is $4–6 million; design is expected to begin in fall 2026, construction documents are to be completed by April 2027, and the first field is targeted for completion in February 2028.
CityCA
Posted
Sep 25, 2026
Dec 4, 2026
Provide architectural and engineering design services for the renovation of the locker room facilities; grout in the shower and floor tile has eroded, creating sanitation concerns and increasing the potential for water intrusion beneath the flooring. The existing rubber flooring has begun to bubble and lift due to prolonged moisture exposure, presenting both a safety hazard and an ongoing maintenance issue. Ventilation in the locker rooms is inadequate, contributing to excess moisture. The existing lockers and benches are original to the facility and are at the end of their service life.