Illinois Department of Transportation
State AgencyIL
Posted
-
Nov 6, 2026
131-78B35 - Bridge Deck Overlay and Repairs
Approx. 4,780 CY Earth excavation; 1,580 CY furnished excavation; 130 P nitrogen fertilizer nutrient; 4,834 SY erosion control blanket; 6 EA inlet and pipe protection; 2,229 P bituminous materials (tack coat); 58.800 CY concrete structures; 1 LS furnishing and erecting structural steel; 5,944 SY bridge deck microsilica concrete overlay 2 3/4". See outside link.
