Alabama Department of Transportation
Special DistrictAL
Posted
Oct 9, 2026
Nov 6, 2026
Description: 4,633 CY earth excavation; 958' grading and shaping ditches; 612 SY erosion control blanket; 120 Ton polymerized hot mix asphalt surface course, IL-9.5, mix D, N70; 955 CY concrete superstructure; 14 cal da changeable message sign; 494' short term pav marking. See outside link.
StateAgency · IL, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Illinois Department of Transportation.
Adjacent opportunities open for bidding right now.
Alabama Department of Transportation
Special DistrictAL
Posted
Oct 9, 2026
Nov 6, 2026
Work includes removal of old bridge, 100 SY removing concrete slope paving, 344 LF removing pipe, 300 LF removing guardrail, 4 EA removing headwalls, 4 EA removing guardrail end anchor, 4 EA removing guardrail end anchor, 2 EA removing inlets, 6,930 CY unclassified excavation, 5,748 CY borrow excavation, 1,204 ton roadbed stabilizing material, 5,081 SY geosynthetic reinforcement for soft soil stabilization, type 3, 7,146 SY crushed aggregate base course, type b, plant mixed, 4" compacted thickness, 1,824 SY crushed aggregate base course, type b, plant mixed, 8" compacted thickness, 784 ton crushed aggregate, section 825, for miscellaneous use. See attached file.
Indiana Department of Transportation
State AgencyIN
Posted
Oct 7, 2026
Nov 5, 2026
Work includes 265 CY of excavation, common; 387 LF of linear grading; 506 SY of milling, asphalt, 1 1/2 in. ; 183 SY of lean concrete base, 9 in. ; 75 LF of guardrail, mgs w-beam, 6 ft 3 in. Spacing; 948 SY of erosion control blanket; 867 SY of mulched seeding, type r; 2,688 SF of waterproofing membrane, type 2 and associated works.
Missouri Department of Transportation
State AgencyMO
Posted
Oct 15, 2026
Nov 20, 2026
Resurface and rebuild pavement, bridge rehabilitation and bridge superstructure replacement
Virginia Department of Transportation
State AgencyVA
Posted
-
Nov 18, 2026
Work include 180 LF 15" storm sewer pipe; 41 LF 18" storm sewer pipe; 69 LF 24" storm sewer pipe; 17,293 CY excavation; 1,084 CY siltation control excavation; 334 LF temp. Silt fence type b; 12,168 LF rumble strip cylindrical asphalt; 14,579 LF saw-cut asphalt concrete (18 in. Depth); 153 CY conc. Cl. A4 bridge appr. Slab const. ; 4,931 CY structure excavation const; 217 LF bridge substructure rock socket drilled shaft (48" dia).